Caption: • a) Savings in the cost of civil foundation works is approx. shs.10 million in Small Size • b) Savings in time to the tune of 20 days @ shs.500,000 per day. This savings is recurring for every relocation of the weighbridge.We are located at Wandege
Credit: Moisture meters shop