Caption: The quantity of concrete to pour depends on the size of the bridge. For a 17.80 m weighbridge, approximately 13 m3 of concrete dosed at 320 kg/m3 are required.We are located at University Plaza Room A18 Bombo Rd, Wandegeya - Kampala For more details
Credit: Weighing systems Uganda Ltd